Custom Gifts and Packaging from China
Plan the product, decoration, kit assembly, packing, inspection, and delivery calendar behind custom gifts and promotional orders from China.
A missing insert, wrong shade, or crushed box can spoil a campaign. Approve the decorated, assembled, and packed unit with your supplier before fixing the production and delivery plan.
Describe the item after branding and packing
Specify the base product, material, dimensions, color, decoration method, artwork size and position, retail pack, quantity, destination, and required delivery date. For a set, add a numbered pick list and a layout showing where each component sits.
Ask suppliers to quote the finished unit and then show the cost drivers: blank product, decoration, setup, custom packaging, insert, assembly, and export carton. A catalog price for an undecorated item is not a usable comparison.
The wholesale RFQ template keeps product and commercial terms together. Use custom packaging when the box, insert, labeling, or unboxing sequence is part of the product rather than an afterthought.
Match the decoration process to the surface
Use this comparison as a supplier-question checklist, not a guarantee of surface suitability. Confirm the process on your actual material, shape, coating, artwork, and expected use.
Scroll horizontally to see all columns →
| Decoration method | Surface suitability to confirm with supplier | What to observe on the sample |
|---|---|---|
| Screen, pad, or full-color print | Material, coating, and flat or curved print area | Coverage, registration, position, and adhesion |
| Engraving | Material and finish at the marked area | Depth, contrast, edges, and placement |
| Embroidery | Selected fabric, seams, and backing | Stitch density, distortion, and logo position |
| Heat transfer | Selected material and decorated area | Adhesion, surface distortion, color, and position |
Keep the approved physical sample, artwork version, color reference, and placement measurements. A digital mockup alone cannot resolve these observations.
Build the set before approving the box
An insert should be designed around the actual products, not only dimensions copied from a catalog. Assemble a complete sample and check fit, movement, opening sequence, protection, printed copy, barcode visibility, and how easily the receiver can put the set together.
Use a numbered pick list with a photo or diagram of the final arrangement. That file becomes the instruction for assembly and inspection. If components come from several suppliers, agree which supplier or third-party warehouse receives, counts, stores, and assembles them under the release plan. The consolidation guide explains the handoffs to confirm.
Inspect the details the recipient will notice first
The inspection plan should cover the base item, decoration color and position, visible finish, customer touch points, component counts, kit arrangement, printed copy, retail pack, carton assortment, and damage. For bags, check handles, zippers, seams, and stress points. For drinkware, include the relevant material and use checks. For electrical gifts or children’s items, destination requirements may need additional documents or specialist testing.
Inspect against the approved decorated and packed sample. The quality control checklist can turn artwork positions, measurements, photos, and packing expectations into a report instruction.
Protect the delivery date with decision deadlines
Fill the checkpoints backward from the required delivery date and have the supplier or relevant third party confirm each dependency. These blanks are a planning record, not promised lead times.
Scroll horizontally to see all columns →
| Checkpoint | Planned / confirmed date | Responsible party and dependency |
|---|---|---|
| Required delivery | ____ / ____ | Receiver; destination and receipt conditions |
| Freight handoff | ____ / ____ | Carrier; approved packed dimensions |
| Inspection and correction | ____ / ____ | Inspector/supplier; release criteria |
| Component production and assembly | ____ / ____ | Supplier/assembler; complete pick list |
| Sample and artwork approval | ____ / ____ | Buyer/supplier; final file and sample |
| Specification and supplier choice | ____ / ____ | Buyer; quoted scope and production calendar |
Measure the complete master carton, including boxes and inserts, and confirm both weight and volume with the carrier. Confirm the final master carton before comparing shipping from China or using the landed cost calculator.
Prepare a campaign brief for your suppliers
Prepare the product idea, audience, quantity, artwork, colors, packing or set layout, destination, delivery deadline, and budget target if available. Use the wholesale RFQ template, then read how to choose a China sourcing agent before comparing providers.
Product types
- Corporate gifts
- Promotional products
- Custom drinkware and totes
- Gift boxes
- Stationery
- Seasonal goods
Typical wholesale buyers
- Agencies
- HR buyers
- Retailers
- E-commerce brands
Main sourcing markets
- Verify the supplier-declared decoration and packaging sites
- Confirm component sources, assembly location, and dispatch point
Information graphic
MOQ and pricing factors
Different decoration processes and supply-chain steps may have separate minimums. Ask for the base-product, decoration, box, and assembly minimums for this order.
Quality control
- Decoration color, registration, size, position, adhesion, and finish
- Handles, zippers, seams, closures, and other customer touch points
- Component count, kit arrangement, inserts, labels, and carton assortment
- Retail pack fit, box condition, edge protection, and master-carton marks
Compliance and documents
Kids’ items and electrical gifts need extra files. A logo on a mug is still a food-contact question.
Shipping considerations
- Seasonal windows are unforgiving
- Kits must match the pick list
- Confirm packed volume, gross weight, and the freight billing basis
Frequently asked questions
Why does adding a logo change the MOQ and price?
Ask which base-product, decoration, or packaging step changes the quoted minimum. Different processes or supply-chain steps may have separate setup charges and minimums; request them separately rather than assuming every method uses a different factory.
How do I prevent missing items in a gift set?
Create a numbered pick list and an approved packed sample showing the position of every component. Inspect component counts and the finished kit before master cartons are sealed.
How early should a seasonal gift order start?
Work backward from the required delivery date and include specification, supplier selection, sample revisions, artwork approval, component production, assembly, inspection, correction, and freight. The exact schedule depends on the product and route.