Quality Control Checklist

A pre-shipment inspection list covering sampling, measurements, function, packaging, labels, and the photos you should keep before paying the balance.

Illustrative photo of a carton opened on an inspection table. Not a specific inspection report.

Updated

Checklist version: . Copy these tables into your inspection record or print this page and fill them in. Unfilled fields are inputs, not inspection results.

Scroll horizontally to see all columns →

Inspection inputOrder record
PO / SKU / lot quantityFill in
Supplier / site / inspection dateFill in
Specification / sample / packing versionsFill in
Sampling scheme / version / inspection levelAgree and record
AQL by defect class / acceptance and rejection criteriaAgree and record separately for each class

Before the inspector arrives

Put current specifications, the approved sample, packing instructions, and defect definitions together. Confirm the sampling plan, inspection level, defect-class AQLs, and scheme/version separately. ISO’s ISO 2859-1 overview describes acceptance sampling by attributes; use the agreed applicable scheme for sample sizes and decisions, rather than guessing from an AQL alone.

On the floor: record actual results

Select cartons under the agreed random sampling plan and record carton IDs and sample distribution across the lot. Keep the selected unit count visible for each check.

Scroll horizontally to see all columns →

Record fieldFill in for every check
PO / SKU / file versionFill in
Item checkedIdentity, dimensions, function, accessories, labels, or packing
Method / instrument / toleranceAgreed method and acceptance criteria
Sample size / carton distributionActual units and selected carton IDs
Actual result / defect class and countMeasurements, test findings, or recorded observations
Evidence ID / linkReport row, photograph, or test record
Disposition / release person / dateHold, correction, rejection, or release; named approver and date

Before accepting the report

Confirm lot identity, sampled cartons, and document versions. Review actual measurements and function results, defect counts and evidence, then reconcile labels, carton quantity, dimensions, and weight with the shipping file. Record the buyer’s disposition before treating the lot as released.

If the lot fails

Request a correction plan tied to the recorded defects. Agree reinspection or defined screening where needed; repair photos alone do not establish correction of the full lot. Record follow-up evidence and a new dated decision.

This checklist records inspection evidence; it does not replace laboratory or regulatory testing. The quality control inspection guide explains methods and sampling boundaries; the pre-shipment inspection guide covers timing and release decisions. Use them with this record, not as substitute test reports.

Illustrative report structure for identity, evidence gaps, and a hold or proceed decision; this is not a completed inspection report.
Illustrative receiving sequence: identify deliveries, resolve discrepancies, reconcile the packing record, then hand off for export.

Buyer resources

Sourcing tools and checklists

Use the RFQ template, supplier scorecard, and landed cost calculator to plan an order and compare supplier assumptions.

Tools & guides